AND TODAY – HOT OFF THE PRESS:
SunPower: Twice As Bad As Solyndra, Twice As Bad For Obama
How did a failing California solar company, buffeted by short sellers and shareholder lawsuits, receive a $1.2 billion federal loan guarantee for a photovoltaic electricity ranch project—three weeks after it announced it was building new manufacturing plant in Mexicali, Mexico, to build the panels for the project.
The company, SunPower (SPWR-NASDAQ), now carries $820 million in debt, an amount $20 million greater than its market capitalization. If SunPower was a bank, the feds would shut it down. Instead, it received a lifeline twice the size of the money sent down the Solyndra drain.
Two men with insight into the process are SunPower rooter Rep. George R. Miller III, (D.-Calif.), the senior Democrat on the House Education and Workforce Committee and the co-chairman of the Democratic Steering and Policy Committee, and his SunPower lobbyist son, George Miller IV.
READ ON:
No comments:
Post a Comment
Feel free to comment on my posts. Know that if you are profane or threatening, your comments will be removed and you will be blocked. Otherwise, welcome to my blog!